RFQ intake, automated

From RFQ package to costed BOM in minutes.

Your customer sends a STEP assembly and a stack of drawings. Stückliste turns them into a quotation-ready Bill of Materials — structure, quantities, masses, materials — while your competitors are still unzipping the folder.

No account needed · STEP AP203/AP214/AP242 · EU processing

ISO VIEW · AUTO-TESSELLATED Rear axle assembly automatically rendered and structured by the Stückliste BOM engine
REAR_LEFT_QUARTER_ASM
BOM lines
49
Envelope
1397 × 916 × 1030 mm
Completeness
100 %
Processing
5.4 s
The quoting bottleneck

The quote clock starts the moment the package lands.

2–4 weeks

of manual BOM building per RFQ package — before your team has priced a single component.

49 components

extracted from a real automotive axle assembly — structured, rendered and exported in under six seconds.

1 st

credible quote usually wins the platform. Fast, defensible answers are how suppliers get designed in.

The pipeline

Six phases. One pass. Zero re-typing.

  1. 01 / INGEST

    Drop the RFQ package

    Upload the STEP assembly exactly as your customer sent it. No CAD seat, no plugin, no native-format headache.

  2. 02 / EXTRACT

    Geometry becomes structure

    Assembly tree, quantities, dimensions and mass estimates come straight out of the geometry — every component, every level.

  3. 03 / UNDERSTAND

    Drawings are read for you

    AI reads the 2D drawings in the package: materials, surface treatments, tolerances and PMI annotations land on the right BOM line.

  4. 04 / VALIDATE

    Quality gates, not gut feeling

    Automated checks score the completeness of your BOM, so you know exactly what is solid and what still needs an engineer’s eye.

  5. 05 / COMPLY

    Requirements, proven

    Every customer requirement is traced to the BOM lines that satisfy it — covered, assumed or gap — and exported as an open compliance contract (JSON + Excel).

  6. 06 / DELIVER

    Kickoff-ready output

    A costed Excel BOM with 3D thumbnails, a risk overview and a kickoff package your sales and engineering teams can act on the same day.

Phases 01–02 and 04–06 run in the public demo right now — including requirements coverage. Phase 03 (AI drawing analysis) and JT / native-format support are part of assisted pilots.

Requirements → BOM

Prove it. Don’t promise it.

Your customer doesn’t ask for a BOM — they ask whether the BOM meets their requirements. Stückliste traces every requirement to the BOM lines that satisfy it and answers with three honest states:

COVERED Covered
Demonstrably satisfied by linked BOM lines — with the evidence attached.
ASSUMED Assumed
Satisfied under a documented assumption that awaits customer confirmation. Nothing silently guessed.
GAP Gap
Not addressed yet — visible from day one, not discovered at PPAP.
Your CAD is your IP

Built for people who sign NDAs for a living.

  • Processed in the EU — Paris region
  • Demo files auto-deleted after 24 h
  • No model training on customer data
  • On-premise option for enterprise pilots
Read the security page →
Pilot program

See it on your RFQ package.

We onboard a limited number of pilot suppliers. Bring one real RFQ package to a 30-minute call — you leave with the BOM.